Bunn U3A service manual SERVICE cont SELECTOR SWITCH HALF BATCH OPTION

Models: U3A U3

1 42
Download 42 pages 23.98 Kb
Page 26
Image 26
SERVICE (cont.)

SERVICE (cont.)

SELECTOR SWITCH (HALF BATCH OPTION)

FIG. 20 SELECTOR SWITCH (HALF BATCH)P1317.30

Location:

The selector switch is located in the upper center of the switch mounting panel.

Test Procedures:

1.Disconnect the brewer from the power source.

2.Disconnect the wires from the switch terminals.

3.Check for continuity across the switch terminals with the switch in the "CLOSED" (left - half) posi- tion. Continuity must not present when the switch is in the "OPEN" (right - full) position.

If continuity is present as described, the switch is operating properly.

If continuity is not present as described, replace the switch.

Removal and Replacement:

1.Remove the wires from the switch terminals.

2.Compress the clips on the back side of the switch mounting bracket and gently push the through the opening.

3.Push the new switch into the opening and spread the clips to hold switch in the mounting bracket.

4.Refer to Fig. 21 and reconnect the wires.

GRY to Brew Timer

PNK to Brew Timer

FIG. 21 SELECTOR SWITCH TERMINALS P1740

Page 26

10060

080900

 

Page 26
Image 26
Bunn U3A service manual SERVICE cont SELECTOR SWITCH HALF BATCH OPTION