Manuals
/
Bush Hog
/
Lawn and Garden
/
Lawn Mower
Bush Hog
RMB 1445
manual
Cutting Sequence
Models:
RMB 1445
1
79
114
114
Download
114 pages
15.94 Kb
76
77
78
79
80
81
82
83
Troubleshooting
Warranty
Maintenance
Dealer Setup Instructions
Assembly Section
Running UP Procedure
Weight
Hose Replacement
Safety
Power Take Off PTO
Page 79
Image 79
OPERATION
8.11 Cutting Sequence
RMB 1445 11/10
Operation Section
4-25
© 2010 Alamo Group Inc.
OPERATION
Page 78
Page 80
Page 79
Image 79
Page 78
Page 80
Contents
RMB
To the Owner/Operator/Dealer
Warranty Information
Page
Alamo Group Ag. Division is willing to provide
Table of Contents
Maintenance Section
Hydraulic Hoses
Page
Safety Section
Safety
Operator Safety Instructions and Practices
SG-36
Wait a minute...Save a life
Equipment Operation Safety Instructions and Practices
Safety
Stop Mowing if Passersby are Within 300 Feet Unless
Safety
SGM-06
SGM-08
Maintenance and Service Safety Instructions and Practices
Safety
Parts Information
Transporting Safety Instructions and Practices
Safety
Concluding Safety Instructions and Practices
Decal Location
Booklet
NFS Serial Plate
Name
Logo
NFS SER PLT
Instruct
MULTI-DECAL
Decal Description
Safety
Safety
Safety
Safety
Safety
Safety
Safety
Federal Laws and Regulations
Page
Introduction Section
Introduction
Introduction
Before Operating this Machine
Assembly Section
Tractor Selection
Tractor Preparation
Installing the Operator Guard Cab Tractor
Factors that affect stability
Ballast
Stabilizer Attachment
Dealer Setup Instructions
TOP Link Attachment
Driveline Attachment
Hose Routing
Remove Transport Strap
ISO VG SAE
Final Assembly Checks
OIL Requirements
Tank
Gearbox
Fitting Control Unit in CAB
Removal from Tractor
Running UP Procedure
RMB 1445/1660/1865 With Flail Head only
Page
Operation Section
Operation
Operation
Personal Protective Equipment PPE
Operator Requirements
Rops and Seat Belt
Tractor Requirements
Operator Thrown Object Protection
Tractor Ballast
Tractor Lighting and SMV Emblem
3-Point Hitch
Tractor Safety Devices
Tractor Horsepower
Front End Weight
Getting on and OFF the Tractor
Power Take Off PTO
Dismounting the Tractor
Boarding the Tractor
Starting the Tractor
PRE-OPERATION Inspection and Service
Tractor Pre-Operation Inspection/Service
Boom Unit Pre-Operation Inspection and Service
Boom ARM Assembly
Frame Assembly
Hydraulic Line Inspection
Hydraulic PUMP/OIL Reservoir
Flail Head Inspection
Sickle BAR Inspection
Do not Operate an Unsafe Tractor or Implement
Do not Operate an Unsafe Tractor or Mower
Machine Controls
Reversing Rotation With Flailhead
Rotor Controls
Engaging Drive
Angle Float
Rotor Operating Speed
Parallel Motion Geometry
Forward Speed
Tractor Position
Operating Speed
High Voltage Cables
Breakaway Action
Cutting Sequence
Grass Cutting
Driving the Tractor and Implement
Starting the Tractor
Brake and Differential Lock Setting
Driving the Tractor and Boom
Operating the Tractor and Implement
Operating Instructions
RMB 1445 11/10 Operation Section
Foreign Debris Hazards
Bystanders/Passersby Precautions
Engaging the Power Take Off PTO
Operating the Mower
Operating Speed and Ground Speed
SGM-08
Grass Flail
Operating the Attached Mower Heads
Sickle Bar
Shutting Down the Attached Head
TRACTOR, BOOM, and Attached Head Storage
Transporting the Tractor and Implement
Transporting on Public Roadways
Operation
Hauling the Tractor and Implement
Operation
Trouble Possible Cause Possible Remedy
Troubleshooting Guide
Operation
Operation
Maintenance Section
Lubrication
Maintenance
PTO Lubrication
PTO Shaft
Cutting PTO Shaft
Maintenance
Hydraulic Hoses
Filtration Maintenance
Hose Replacement
Hydraulic System
PTO Gearbox
Hose Warranty
Cables
Flailhead
Proper Torque Values for Fasteners
Hose Connections
Main Control Valve
Maintenance
Page
Limited Warranty
Required of the Operator
Required of the Owner
RMB 1445 Rear Mount Boom Mower
Top
Page
Image
Contents