Chapter 5 Diagnostics
Power-On Self Test
A
The POST sequence checks the system integrity by performing the following tests:
−System boot
−RAM test
−Timer and interrupt controller tests
−Cache controller test
−
−BIOS test
−EEPROM checksum test
−Program load checksum test
−Ethernet ports test
Besides the Power On/Off LED, there are eight system Status LEDs used to display the results of these tests during the POST sequence. The LED status further display test results in two categories, the System test and the Port test. Any errors from the System tests means that the Switch failed to function. Any error(s) from the Port test effects that individual port and the remaining ports will be operational.
41