9032579-03 Installation 19
After these two tests are performed, the operation al software of the swi tch
is loaded. A series of more extensive diagno stic tests are then con ducted
during which the Test LED remains lit. The results of the tests are
displayed on the terminal. If all tests pass, the Test LED turns off. When
all tests are complete, the system is functional and the user interface is
ready to receive commands at the console.