TESTING AND LANVIEW
5.Using a transceiver (5) and an AUI cable, connect another
(4) to the other segment connected to the bridge.
6.Select and run test 4 - NODE on the
7.Verify that this test passes. At least 100 packets should be sent and received by the bridge, with no errors. Packets will be sent from this
When the NB20E or NB25E have successfully completed these tests, the bridge is ready for normal operation. If any failures were noted, please contact Cabletron Systems' Technical Support.
4.2USING LANVIEW
The NB20E and NB25E Two Port Ethernet Bridges use Cabletron Systems'
Seg. A | Seg. B |
1
5
|
| 3 |
2 | 1. | 4 |
2.
3. NB 20E/25E
4.
5.
Figure