Powering Up and Stacking the SEH

19-Inch Rack

HubSTACK 100BASE-TX HUB WITH LANVIEW® SEH100TX-22

 

RCV

 

 

 

 

 

 

 

 

LNK

 

 

 

 

 

 

E

 

22 21 20 19 18 17 16 15 14 13 12

2

PWR

 

 

 

 

 

 

 

 

MGMT

RCV

 

 

 

 

 

 

 

CLN

LNK

 

 

 

 

 

 

E

 

11 10 9 8 7

6

5

4

3

2

1

1

EPIM 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

22X

21X

20X

19X

18X

17X

16X

15X

14X

13X

12X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11X

10X

9X

8X

7X

6X

5X

4X

3X

2X

1X

EPIM 1

Screws (4)

1510_06

Figure 4-4 Installing the SEH in the Rack

Proceed to Section 4.4, Powering Up and Stacking the SEH.

4.4POWERING UP AND STACKING THE SEH

The following section details the procedures that must be followed to power up and interconnect stacked hubs.

Failure to follow this procedure may result in damage to the

!equipment.

CAUTION

If you are using an intelligent hub (SEHI) to manage the stack,

!you must locate the SEHI at the bottom of the stack.

CAUTION

The SEHI must be completely powered up and initialized before powering up and interconnecting the rest of the stack.

If you are using an SEHI to manage the SEH stack, proceed to Section 4.4.1. If you are not using an SEHI to manage the SEH stack, proceed to Section 4.4.2.

SEH100TX User’s Guide

4-5

Page 29
Image 29
Cabletron Systems SEH100TX-22 manual Powering UP and Stacking the SEH, Powering Up and Stacking the SEH