
Powering Up and Stacking the SEH
19-Inch Rack
HubSTACK 100BASE-TX HUB WITH LANVIEW® SEH100TX-22
| RCV |
|
|
|
|
|
|
|
| LNK |
|
|
|
|
|
| E |
| 22 21 20 19 18 17 16 15 14 13 12 | 2 | ||||||
PWR |
|
|
|
|
|
|
|
|
MGMT | RCV |
|
|
|
|
|
|
|
CLN | LNK |
|
|
|
|
|
| E |
| 11 10 9 8 7 | 6 | 5 | 4 | 3 | 2 | 1 | 1 |
EPIM 2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
22X | 21X | 20X | 19X | 18X | 17X | 16X | 15X | 14X | 13X | 12X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11X | 10X | 9X | 8X | 7X | 6X | 5X | 4X | 3X | 2X | 1X |
EPIM 1
Screws (4)
1510_06
Figure 4-4 Installing the SEH in the Rack
Proceed to Section 4.4, Powering Up and Stacking the SEH.
4.4POWERING UP AND STACKING THE SEH
The following section details the procedures that must be followed to power up and interconnect stacked hubs.
Failure to follow this procedure may result in damage to the
!equipment.
CAUTION
If you are using an intelligent hub (SEHI) to manage the stack,
!you must locate the SEHI at the bottom of the stack.
CAUTION
The SEHI must be completely powered up and initialized before powering up and interconnecting the rest of the stack.
If you are using an SEHI to manage the SEH stack, proceed to Section 4.4.1. If you are not using an SEHI to manage the SEH stack, proceed to Section 4.4.2.
SEH100TX User’s Guide |