
Contents
CHAPTER 4 | INSTALLATION |
| |
4.1 | Unpacking the SEH | ||
4.2 | Tabletop or Shelf Installation | ||
4.3 | Rackmount Installation | ||
4.4 | Powering Up and Stacking the SEH | ||
| 4.4.1 Stacking SEH Hubs with an SEHI | ||
| 4.4.2 Stacking Unmanaged SEH Hubs Together | ||
4.5 | Installing an EPIM | ||
CHAPTER 5 CONNECTING TO THE NETWORK |
| ||
5.1 | Connecting the | ||
| 5.1.1 Connecting to Network Ports | ||
| 5.1.2 Connecting to an | ||
| 5.1.3 nnecting an | ||
5.2 | Testing the Installation | ||
CHAPTER 6 | TROUBLESHOOTING |
| |
6.1 | Installation Test | ||
6.2 | Using LANVIEW | ||
APPENDIX A | EPIM INFORMATION |
| |
A.1 | EPIM Specifications | ||
| A.1.1 | ||
| A.1.2 | ||
| A.1.3 |
INDEX
vi | SEH100TX User’s Guide |