Cabletron Systems SEH100TX-22 manual Chapter Installation, Unpacking the SEH

Models: SEH100TX-22

1 52
Download 52 pages 14.61 Kb
Page 25
Image 25

CHAPTER 4

INSTALLATION

This chapter outlines the procedure for attaching the SEH to the network as a stackable or standalone device. Ensure that the network meets the guidelines and requirements outlined in Chapter 3, Installation Requirements and Specifications, before installing the SEH.

NOTE

A single phase grounded power receptacle that meets the power supply requirements listed in Chapter 3 must be located within seven feet of the installation.

Failure to follow installation instructions may result in damage to the equipment or electrical shock hazard.

This chapter covers the following topics:

Unpacking the SEH (Section 4.1)

Installing the SEH in a tabletop configuration (Section 4.2)

Rack Mounting the SEH (Section 4.3)

Powering Up and Stacking the SEH (Section 4.4)

Installing Optional EPIMs (Section 4.5)

4.1UNPACKING THE SEH

Unpack the SEH as follows:

1.Remove the shipping material covering the SEH in the shipping box.

2.Carefully remove the SEH from the shipping box and set it aside to prevent damage.

3.Visually inspect the SEH. If there are any signs of damage, contact Cabletron Systems Technical Support immediately. Refer to Section 1.3, Getting Help, for instructions.

SEH100TX User’s Guide

4-1

Page 25
Image 25
Cabletron Systems SEH100TX-22 manual Chapter Installation, Unpacking the SEH