Canon iR6570 manual Check Sheet for the Periodic Inspection of the Breaker

Models: iR6570 6570

1 88
Download 88 pages 35.31 Kb
Page 86
Image 86
Check Sheet for the Periodic Inspection of the Breaker

Check Sheet for the Periodic Inspection of the Breaker

Copy this page for future use, and store it in a safe place near the machine in order to document your periodic inspections of the breaker.

How to Inspect the Breaker Periodically

Follow the procedure described in "Periodic Inspection of the Breaker," on p. xxiv, once or twice a month.

How to Fill in This Check Sheet

4

Appendix

Fill in the date of inspection and the name of the inspector.

When the inspection is completed successfully, write a check mark under "OK."

If not, contact your local authorized Canon dealer. (Also, write a check mark under "NG" (No Good).)

 

Date of

Inspector

Result

 

Date of

Inspector

Result

 

 

Inspection

OK

NG

 

Inspection

OK

NG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4-6Check Sheet for the Periodic Inspection of the Breaker

Page 86
Image 86
Canon iR6570 manual Check Sheet for the Periodic Inspection of the Breaker, How to Inspect the Breaker Periodically