Output Stacker
4. Pull out the Basket Hooks from the left and right side of the Ejection Guide .
5. Attach the Basket Rod to the Basket Hooks so that the white tag of the Basket Cloth is on
the left side.
6. Form the Basket Cloth into a sloping shape to make it taut, and attach the middle Basket Rod to
the Rod Holder .
224 Handling Paper