38AQS008
Installation, Start-Up and
Service Instructions
CONTENTS
Page
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . 1
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . .
•UNCRATE UNIT
•INSPECT SHIPMENT
•CONSIDER SYSTEM REQUIREMENTS
Step 2 — Rig and Mount the Unit . . . . . . . . . . . . 2
•RIGGING
•MOUNTING
•COMPRESSOR MOUNTING
Step 3 — Complete Refrigerant Piping
Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
•SIZE REFRIGERANT LINES
•FILTER DRIER AND MOISTURE INDICATOR
•LIQUID LINE SOLENOID VALVE
•SAFETY RELIEF
•SUCTION PIPING AT INDOOR COIL AND TXV SENSING BULB LOCATION
Step 4 — Make Electrical Connections . . . . . . . 3
•FIELD POWER SUPPLY
•ACCESSORY ELECTRIC HEAT
•FIELD CONTROL WIRING
Preliminary Checks . . . . . . . . . . . . . . . . . . . . . . . . 10
Evacuate and Dehydrate . . . . . . . . . . . . . . . . . . . 10
Refrigerant Charge . . . . . . . . . . . . . . . . . . . . . . . . 10
Refrigerant Service Ports . . . . . . . . . . . . . . . . . . 10
Sequence of Operation . . . . . . . . . . . . . . . . . . . . 10
Checking Cooling and Heating Control
Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Malfunction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Compressor Removal . . . . . . . . . . . . . . . . . . . . . . 11
Cooling Mode Operation . . . . . . . . . . . . . . . . . . . 12
Heating Mode Operation . . . . . . . . . . . . . . . . . . . 12
TROUBLESHOOTING CHART . . . . . . . . . . . . . . 14,15
SAFETY CONSIDERATIONS
Installing and servicing
When working on
Follow all safety codes. Wear safety glasses and work gloves. Use quenching cloth for brazing operations. Have fire ex- tinguisher available. Read these instructions thoroughly. Con- sult local building codes and National Electrical Code U.S.A. (NEC) for special installation requirements.
Before installing or servicing system, always turn off main power to system. There may be more than one dis- connect switch. Electrical shock can cause personal injury.
INSTALLATION
The 38AQS008 unit uses a
The 38AQS008 is approved by Carrier for use only with 40RMQ008 fan cooling units. Use only approved far coils.
The 38AQS008 (60 Hz) is Underwriters’ Laboratories (UL) and Canadian Underwriters’ Laboratories (CUL) approved for use with the 40RMQ008 fan coil only.
Step 1 — Complete Pre-Installation Checks
UNCRATE UNIT (See Fig. 1) — Remove unit packaging except for the top skid assembly and wood bumpers, which should be left in place until after unit is rigged into place.
INSPECT SHIPMENT — File claim with shipping com- pany if shipment is damaged or incomplete.
Fig. 1 — 38AQS008 Unit
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book | 1 | 4 |
| PC 111 | Catalog No. | Printed in U.S.A. | Form | Pg 1 | Replaces: | |
Tab | 5a | 5a |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|