Table 2 — Refrigerant Piping Sizes

Table 2 — Refrigerant Piping Sizes

 

 

LINEAR LENGTH OF PIPING — ft (m)

 

 

 

0-25

 

25-50

 

 

50-75

 

75-100

 

UNIT

(0-7.6)

(7.6-15.2)

 

(15.2-22.9)

 

(22.9-30.5)

 

38AQS

 

 

 

 

Line Size (in. OD)

 

 

 

 

L

S

L

 

S

 

L

 

S

 

L

S

008

12

118

58

118

 

58

 

118

 

58

118

 

 

 

 

 

 

LEGEND

 

 

 

 

 

 

 

L — Liquid Line OD — Outside Diameter

S — Suction Line

NOTES:

1.Pipe sizes are based on a 2° F (1° C) loss for liquid and suction lines.

2.Pipe sizes are based on the maximum linear length shown for each column, plus a 50% allowance for fittings.

3.Charge units with R-22 in accordance with unit installation instructions.

4.Line size conversion to mm is:

in.

 

mm

12

12.7

58

15.9

34

19

118

28.6

138

34.9

SIZE REFRIGERANT LINES — Consider length of piping required between 38AQS unit and 40RMQ unit, amount of liquid lift, and compressor oil return. See Table 3 and also refer to Part 3 of Carrier System Design Manual for design details and line sizing. Refer to 40RMQ installation instruc- tions for additional information.

Table 3 — Liquid Line Data

 

 

 

MAX

 

 

 

 

 

 

 

ALLOWABLE

 

LIQUID LINE

 

UNIT

 

 

LIQUID LIFT

 

 

 

 

38AQS

Heating

Cooling

Max Allowable

Max Allowable

 

Pressure Drop

Temp Loss

 

 

 

 

 

 

 

ft

 

m

ft

m

psi

kPa

F

C

008

75

 

22.9

65

19.8

7

48

2

1

1.The liquid lift in cooling mode is based on 80/67 F (22.7/19.4 C) (db/wb [dry bulb/wet bulb]) entering indoor-air temperature and a 95 F (35 C) outdoor-air temperature, with R-22 refrigerant, at an indoor airflow of 3000 cfm (1416 L/s).

2.The liquid lift in heating mode is based on 70/60 F (21.1/15.6 C) (db/wb) entering indoor-air temperature and a 47/43 F (8.3/6.1 C)

(db/wb) outdoor-air temperature, with R-22 refrigerant, at an in- door airflow of 3000 cfm (1416 L/s).

FILTER DRIER AND MOISTURE INDICATOR — See Fig. 5. The filter drier is factory supplied and field-installed in the liquid line. Moisture indicator is field-supplied and should be installed just after liquid line shutoff valve. Do not use a receiver; there is none provided with unit and one should not be used.

NOTE: Unit is shipped with R-22 holding charge. System pressure must be relieved before removing caps. Recover re- frigerant prior to brazing.

Pass nitrogen or other inert gas through piping while braz- ing to prevent formation of copper oxide.

LIQUID LINE SOLENOID VALVE — A field supplied liq- uid line solenoid valve (LLSV) is recommended when pip- ing system length exceeds 75 ft (23 m). The LLSV must be of the biflow type, suited for use in heat pump systems.

NOTE: Carrier recommends part number EF23JS214 (Sporlan model CB14S2, 58-in. ODF/78-in. ODM) available from the Replacement Components Division of Carrier Corporation. This solenoid requires field supplied Sporlan MKC-2 coils.

Wire the solenoid in parallel with the compressor con- tactor coil.

Install the LLSV near the outdoor unit. The flow arrow must be pointed toward the outdoor unit.

SAFETY RELIEF — A fusible plug is located on top of the accumulator. See Fig. 6. Note that all safety relief compo- nents are factory installed. Do not cap fusible plug. If local code requires additional safety device(s), install as directed.

SUCTION PIPING AT INDOOR COIL AND TXV SENS- ING BULB LOCATION — To achieve good mixing of re- frigerant leaving the indoor coil suction header for proper sensing by the thermostatic expansion valve (TXV) bulb (see Fig. 7):

1.A minimum of two 90-degree elbows should be installed upstream of the TXV bulb location.

2.The TXV bulb should be located on a vertical riser where

possible. If a horizontal location is necessary, secure the bulb at approximately the 4 o’clock position or the 8 o’clock position. See Fig. 7.

3.Enter suction pipe sizing charts in the Carrier System De- sign Manual at design tons and equivalent length for 2° F (1° C) loss. If the reading falls between 2 sizes on the chart, choose the smaller pipe size.

4.Make sure that the piping system has no inherent oil traps, and the piping layout will not allow oil to migrate into an idle evaporator coil.

5.Complete refrigerant piping from indoor coil to outdoor coil before opening liquid and suction lines at the 38AQS unit. See Tables 1A, 1B, and 2 for piping selection data.

Step 4 — Make Electrical Connections

Unit cabinet must have an uninterrupted, unbroken elec- trical ground to minimize the possibility of personal in- jury if an electrical fault should occur. This ground may consist of electrical wire connected to unit ground lug in control compartment, or conduit approved for elec- trical ground when installed in accordance with NEC ANSI (American National Standards Institute, U.S.A.)/ NFPA (National Fire Protection Association, U.S.A.) 70 and local electrical codes. Failure to follow this warn- ing could result in the installer being liable for personal injury of others.

FIELD POWER SUPPLY — All units except 208/230-v (60 Hz) units are factory wired for the voltage shown on the nameplate. If the 208/230-v unit is to be connected to a 208-v power supply, the transformer must be rewired by moving the black wire from the 230-v orange wire on the trans- former and connecting it to the 208-v red wire from the trans- former. The end of the orange wire must then be insulated.

Refer to unit label diagram for additional information. Short wire leads (pigtails) are provided for field wire connections. Use factory-supplied splices or UL approved copper/ aluminum connector.

When installing units, provide a disconnect per NEC (U.S.A.).

399

3

Page 3
Image 3
Carrier 38AQS008 specifications Make Electrical Connections, Refrigerant Piping Sizes, Liquid Line Data