START-UP CHECKLIST
I. PRELIMINARY INFORMATION
OUTDOOR UNIT: MODEL NO. ___________________ | SERIAL NO. ___________________________________ |
INDOOR UNIT: MODEL NO. _____________________ | SERIAL NO. ___________________________________ |
ACCESSORIES: __________________________________________________________________________________
PISTONS: INDOOR SIZE: ____________
OUTDOOR SIZE: ____________
REFRIGERANT PIPING: EQUIVALENT LINE LENGTH: ____________
LIFT: FAN COIL ABOVE OUTDOOR UNIT? ____________
FAN COIL BELOW OUTDOOR UNIT? ____________
II.PRE-START-UP
INDOOR UNIT (REFER TO OUTDOOR UNIT INSTALLATION INSTRUCTIONS FOR OUTDOOR UNIT
IS THERE ANY SHIPPING DAMAGE? ____________
IF YES, WHERE? ____________________________________
WILL THIS DAMAGE PREVENT UNIT
IS POWER SUPPLY CORRECT? ____________
HAS GROUND WIRE BEEN CONNECTED? ____________
HAS THE CORRECT SIZE FUSE OR HACR BREAKER BEEN PROVIDED? ____________
ARE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY? ____________
IS THE DISCONNECT SWITCH INSTALLED WITHIN SIGHT OF THE UNIT? ____________
IS THE
HAS CONDENSATE DRAIN BEEN RUN, SLOPED AND TRAPPED PROPERLY? ____________
IS FILTER(S) IN PLACE? ____________
IS UNIT MOUNTED LEVEL? ____________
IS HEATING PISTON INSTALLED (FIG. 13), THE CORRECT SIZE, AND IN THE CORRECT DIRECTION? ____________
III.PIPING
IS A LIQUID LINE SOLENOID INSTALLED IF REQUIRED BY
IS FILTER DRIER INSTALLED AT THE OUTDOOR UNIT? ____________
HAVE LEAK CHECKS BEEN MADE AT THE COMPRESSOR, OUTDOOR UNIT, FLARE CONNECTIONS, FILTER DRIERS, AND FUSIBLE PLUGS WITH A LEAK DETECTOR?* ____________
*FIELD PIPING AND ALL TUBING CONNECTIONS MUST BE LEAK TESTED BY THE PRESSURE METHOD DE- SCRIBED IN CARRIER GENERAL TRAINING FOR AIR CONDITIONING MANUAL (GTAC2), MODULE 5. USE