START-UP CHECKLIST (cont)
HAS PIPING SYSTEM BEEN EVACUATED TO 1000 MICRONS (IF REQUIRED)? ____________
HAS SYSTEM CHARGE BEEN WEIGHED IN (IF REQUIRED)? ____________
HAVE SERVICE VALVES BEEN FULLY BACKSEATED? ____________
CHECK VOLTAGE: IS VOLTAGE WITHIN RANGE SHOWN FOR UNIT (WITH UNIT OPERATING)?
OUTDOOR ____________ INDOOR ____________
IV. START-UP
IF UNIT HAS A CRANKCASE HEATER, HAS IT BEEN ON FOR 24 HOURS? ____________
MEASURE AND RECORD THE:
AIR ENTERING OUTDOOR UNIT: ____________ F
AIR ENTERING INDOOR UNIT: ____________ F
DISCHARGE LINE TEMPERATURE: ____________ F
VAPOR LINE TEMPERATURE: ____________ F
MEASURE AND RECORD THE:
VAPOR LINE PRESSURE: ____________ PSIG
DISCHARGE PRESSURE: ____________ PSIG
Copyright 2006 Carrier Corporation
|
| Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. | ||||||
Book | 1 | 4 | Catalog No. | Printed in U.S.A. | Form | Pg | 706 | |
Tab | 3d | 2c |
|
|
|
|
|
|
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -