GENERAL

Recognize safety information. This is the safety alert symbol ( ). When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.

INSTALLATION WARNING

Electrical shock can cause personal injury or death. Before installing or servicing system, always turn off main power to system. There may be more than one disconnect switch. Turn off accessory heater power if applicable. Install lock- out tag.

GENERAL

The Aquazone™ 50PSW water source heat pump (WSHP) is a single-package vertically mounted unit with electronic con- trols designed for year-round cooling and heating.

IMPORTANT: The installation of water source heat pump units and all associated components, parts, and accessories which make up the installation shall be in accordance with the regulations of ALL authorities having jurisdiction and MUST conform to all applicable codes. It is the responsi- bility of the installing contractor to determine and comply with ALL applicable codes and regulations.

INSTALLATION

Step 1 — Check Jobsite — Installation, operation and maintenance instructions are provided with each unit. Before unit start-up, read all manuals and become familiar with the unit and its operation. Thoroughly check out the system before operation. Complete the inspections and instructions listed below to prepare a unit for installation. See Table 1 for unit physical data.

Units are designed for indoor installation only. Be sure to al- low adequate space around the unit for servicing. See Fig. 1 and 2 for overall unit dimensions.

These units are not approved for outdoor installation and must be installed indoors in the structure being conditioned. Do not locate in areas where ambient conditions are not main- tained within 4.4 to 37.8 C.

Table 1 — 50PSW Unit Physical Data CAUTION

To avoid equipment damage, do not use these units as a source of heating or cooling during the construction pro- cess. The mechanical components used in these units can quickly become clogged with construction dirt and debris which may cause system damage.

Step 2 — Check Unit — Upon receipt of shipment at the jobsite, carefully check the shipment against the bill of lading. Make sure all units have been received. Inspect the car- ton or crating of each unit, and inspect each unit for damage. Ensure the shipping company makes proper notation of any shortages or damage on all copies of the freight bill. Concealed damage not discovered during unloading must be reported to the shipping company within 15 days of receipt of shipment.

NOTE: It is the responsibility of the purchaser to file all necessary claims with the shipping company.

1.Verify unit is correct model for entering water tempera- ture of job.

2.Be sure the location chosen for unit installation provides ambient temperatures maintained above freezing. Well water applications are especially susceptible to freezing.

3.Be sure the installation location is isolated from sleeping areas, private offices and other acoustically sensitive spaces.

NOTE: A sound control accessory package may be used to help eliminate sound in sensitive spaces.

4.Provide sufficient access to allow maintenance and servicing of the compressor and coils.

5.Provide an unobstructed path to the unit within the closet or mechanical room. Space should be sufficient to allow removal of unit if necessary.

6.Provide ready access to water valves and fittings, and screwdriver access to unit side panels.

7.Where access to side panels is limited, pre-removal of the control box side mounting screws may be necessary for future servicing.

STORAGE — If the equipment is not needed for immediate installation upon its arrival at the jobsite, it should be left in its shipping carton and stored in a clean, dry area of the building or in a warehouse. Units must be stored in an upright position at all times. If carton stacking is necessary, stack units a maxi- mum of 3 cartons high. Do not remove any equipment from its shipping package until it is needed for installation.

Table 1 — 50PSW Unit Physical Data

50PSW UNIT SIZE

036

 

060

 

120

 

180

 

 

360

NOMINAL CAPACITY (kW)

10.5

 

17.6

 

35.2

 

49.2

 

 

105.5

WEIGHT (kg)

 

 

 

 

 

 

 

 

 

 

Operating

158

 

163

 

329

 

358

 

 

604

Packaged

169

 

175

 

349

 

363

 

 

608

COMPRESSOR (qty)

Scroll (1)

 

Scroll (1)

 

Scroll (2)

 

Scroll (1)

 

 

Scroll (2)

REFRIGERANT TYPE

 

 

 

 

R-410A

 

 

 

 

 

Factory Charge Per Circuit (kg)

2.04

 

2.83

 

2.83

 

6.80

 

 

6.80

 

 

 

 

CONNECTIONS, FPT (in.)

 

 

 

 

 

 

 

 

 

2

Commercial Load/Source

3/4

 

1

 

11/2

 

2

 

 

 

 

 

 

HWG Water In/Out

 

 

1/2

 

 

 

 

N/A

WATER VOLUME (L)

3.64

 

5.04

 

10.02

 

13.27

 

 

25.44

LEGEND

HWG — Hot Water Generator

NOTES:

1.Maximum working pressure on the base unit is 3445 kPa.

2.Units have a dual isolated compressor mounting.

3.Units have a balanced port expansion valve (TXV).

4.Insulated source and load water coils are standard.

5.Insulated refrigerant circuit is standard.

6.Compressor is on (green) light and fault on (red) light.

2