CFM Corporation DVT44IN Electrical Junction Box, Control System Installation, Chateau

Models: DVT44IN DVT38IN

1 48
Download 48 pages 13 Kb
Page 8
Image 8
Electrical Junction Box

Chateau™

Electrical Junction Box

The fireplace, when installed, must be elec- trically connected and grounded in accord- ance with local codes or, in the absence of local codes, with the current CSA C22.1 Canadian Electrical Code or the national electrical code ANSI/NFPA No. 70 in the USA.

It is strongly suggested that the wiring of the Electrical Junction Box be carried out by a licensed electrician.

Ensure the power to the supply line has been disconnected before commencing this procedure.

Control System

The gas control system is located on the right hand side of the firebox behind an access panel and the decora- tive brick panel. The fireplace is operated using only the hand held remote control unit. The system wiring diagram is shown in Figure 11. NOTE: If you choose to install the optional battery back-up, (Model DVT- BBK), refer to Item #16 in the next section.

Control System Installation

1.Locate the fireplace in the desired location.

2.Remove the glass. Refer to Glass Frame Assembly Removal section.

3.If installed, remove the lava rock, volcanic rock, andirons, embers and logs, making note of each log’s location.

4.If installed, remove the refractory brick panel right side and rear pieces.

5.Using a back-up wrench, disconnect the gas supply fitting near the right rear corner of the firebox. (Fig. 8)

Pressure Test Ports

Gas Supply Fitting

Cover Plate

FP1793

Fig. 8 Disconnect gas supply fitting and remove 13 screws securing the cover plate.

6.Remove pilot assembly from burner assembly by removing two (2) screws.

7.Carefully slide the burner assembly to the left out of the way, taking care not to bend or break the pilot tubes or wiring.

8.Remove 13 screws around the perimeter holding large access panel on the right hand side of the firebox.

9.Carefully pull back the panel just enough to gain access to control box.

10.Connect the gas supply to the valve. (Fig. 9) Be sure to use a back-up wrench when tightening sup- ply fitting.

Gas Supply

Fitting

FP1794

Fig. 9 Connect gas supply to valve.

11.Connect a 120V AC electrical supply to the junc- tion box duplex outlet. Use a Romex-type strain relief connector when running wires out through the box knockout. Replace the duplex outlet and cover plate.

12.Plug the AC adaptor plug into the duplex outlet.

13.This control system must now be programmed to the hand held remote control transmitter. To pro- gram the remote control, make sure the 120V AC is connected and powered to the fireplace.

14.Remove the battery door on the back of the hand held remote control and install two (2) supplied “AAA” batteries. Be sure to note correct polarity. Replace battery door.

15.Locate the learn button on the main module. (Fig. 10) Press and release the learn button using a pencil point. There will be a beep sound from the module. Then press any key on the remote control transmitter. Once the module’s internal receiver ac- cepts the transmitter code, there will be a series of confirming beeps.

8

20011956

Page 8
Image 8
CFM Corporation DVT44IN, DVT38IN Electrical Junction Box, Control System Installation, Chateau, 20011956