Install the SFP Modules and Connect to the Ports

Follow these steps:

Step 1 Grasp the module on the sides, and insert it into the switch slot until you feel the connector snap into place.

Step 2 Insert an appropriate cable into the module port. Insert the other cable end into the other device.

Catalyst

 

 

 

W

3750G

SERIES

PoE-24

ireless

 

 

LAN

 

 

 

Controller

13

14

16

 

 

 

 

13X

15

 

 

 

 

 

 

17

18

20

 

 

 

 

 

19

22

 

 

 

 

 

21

24

 

 

 

 

 

23

 

 

 

 

 

 

23X

14X

 

 

 

 

 

 

25 26

SFP module

Catalyst

 

 

 

W

3750G

SERIES

PoE-24

ireless

 

 

LAN

 

 

 

Controller

13

14

16

 

 

 

 

13X

15

 

 

 

 

 

17

18

 

 

 

 

 

 

19

20

22

 

 

 

 

 

21

24

 

 

 

 

 

23

23X

14X

26

SFP module port

For a list of supported modules, see the release notes on Cisco.com. For detailed instructions on installing, removing, and connecting to SFP modules, see the documentation that came with the SFP module.

Caution Removing and inserting an SFP module can shorten its useful life. Do not remove and insert SFP modules more often than is absolutely necessary.

Verify Port Connectivity

After you connect to the switch port, the port LED turns amber while the switch establishes a link. This process takes about 30 seconds. Then the LED turns green when the switch and the target device have an established link. If the LED is off, the target device might not be turned on, there might be a cable problem, or there might be a problem with the adapter installed in the target device. See the “In Case of Difficulty” section on page 34 for information about online assistance.

33

Page 33
Image 33
Cisco Systems 3750G manual Install the SFP Modules and Connect to the Ports