Cisco Systems CISCO10720 Installing and Removing the Uplink Cards, Tools and Equipment Required

Models: CISCO10720

1 83
Download 83 pages 10.32 Kb
Page 33
Image 33

C H A P T E R 3

Installing and Removing the Uplink Cards

This chapter provides information about installing and removing the uplink cards. The following sections are in this chapter:

Tools and Equipment Required, page 3-1

Preparing for Installation, page 3-2

Removing the Cable-Management System, page 3-4

Removing the Uplink Card, page 3-8

Installing an Uplink Card, page 3-9

SONET Distance Information for RPR/SRP, DPT, and POS/DPT Uplink Cards, page 3-11

Connecting the Ports on the RPR/SRP, DPT, and POS/DPT Uplink Cards, page 3-12

Installing the Cable-Management System, page 3-15

Turning On Power to the Router, page 3-16

Verifying Uplink Card Functionality, page 3-23

Configuring the RPR/SRP, DPT, and POS/DPT Uplink Card Interfaces, page 3-23

Tools and Equipment Required

The following tools are required to install or remove an uplink card on the Cisco 10720 Internet Router:

ESD-preventive wrist strap

1/8-inch flat-blade screwdriver

Number 1 Phillips screwdriver

Antistatic bag

Cable ties

Antistatic mat (optional)

Uplink card

 

 

Book Title

 

 

 

 

 

 

 

78-13113-06 B0

 

 

3-1

 

 

 

 

 

Page 33
Image 33
Cisco Systems CISCO10720 manual Installing and Removing the Uplink Cards, Tools and Equipment Required