Cisco Systems Gateway 10 quick start DC PEM captive screws

Models: Gateway 10

1 40
Download 40 pages 53.37 Kb
Page 29
Image 29
DC PEM captive screws

Figure 22 DC PEM LEDs

1

2

3

4

5

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background 6

Manual backgroundManual background 7

1

273687

8

1

DC PEM captive screws

5

Fan

 

 

 

 

2

DC PEM On () /Off (O) switch

6

DC PEM handle

 

 

 

 

3

Earth grounding symbol

7

DC PEM LEDs

 

 

 

 

4

DC PEM earth ground lug

8

DC PEM terminal and plastic cover

 

 

 

 

Note With both the DC PEMs installed, both need to be operating with breaker switches on and OUTPUT OK LED on. If one PEM is not operational, it is recommended that either the PEM be removed from the system or the power input cables be removed to limit power supply Conductive Emissions (FCC conductive Emission Requirements).

When the power-on sequence is complete, the supervisor card begins to initialize the line cards.

29

Page 29
Image 29
Cisco Systems Gateway 10 quick start DC PEM captive screws