Cisco Systems SFS 3012 quick start Prepare the Site, Install Topspin 360 FRUs

Models: SFS 3012

1 28
Download 28 pages 17.41 Kb
Page 10
Image 10
Prepare the Site

2

1 Topspin 360 Server Switch

1 or 2 12-port InfiniBand switch blades

1 or 2 power supplies

1 or 2 fan trays

1 or 2 system controllers

2 rack-mount brackets and mounting screws

1 power-supply blanking panel

1 expansion card blanking panel

1 console-cable kit, which includes a DB-9 M/F serial cable

1 or 2 6-foot (1.8-meter) AC power cables

1 CD-ROM containing software and user documentation

1 Quick Start Guide

1 warranty card

Prepare the Site

To prepare the site for the Topspin 360, perform the following steps:

1.Read the cautionary statements in “Safety Information” on page v.

2.Register the Topspin system online. Go to http://www.topspin.com/support/prodreg.cfm.

3.Verify that the rack environment provides sufficient ventilation.

4.Unpack the Topspin 360 package.

5.Verify that you have all of the items on the Requirements list. Refer to “Requirements” on page 1.

Install Topspin 360 FRUs

Install gateways and switch cards to increase the port count of your switch.

NOTE: Whenever possible, install all FRUs before you rack your Topspin 360. You can continue to add or replace FRUs after you rack your device.

Page 10
Image 10
Cisco Systems SFS 3012 quick start Prepare the Site, Install Topspin 360 FRUs