11.For
12.For
13.Rinse the parts in clean water, reassemble the valve and reconnect it to the dispenser.
14.Discard the tank of sanitizing solution and reconnect the product (syrup or
Sanitize B-I-B Systems
1.Remove all the quick disconnects from all the
2.Fill a suitable pail or bucket with soap solution.
3.Submerge all disconnects (gas and liquid) in the soap solution and then clean them using a nylon bristle brush. (Do not use a wire brush). Rinse with clean water.
4.Using a plastic pail, prepare approximately five (5) gallons of sanitizing solution.
5.Rinse the
6.Sanitizing fittings must be attached to each
7.Place all the
8.Remove the nozzle and syrup diffuser from each valve and clean them in a soap solution. Rinse with clean water and reassemble the nozzle and syrup diffuser to the valve.
9.Remove the sanitizing fittings from the
ICE AUGER SPEED CONTROL
The ice auger is a variable speed device. A potentiometer is used to control this speed. The potentiometer is located on the CB 1 control board (see Figure 4). The CB 1 control board is located inside the electrical control box which is below the counter facing towards the front of the counter. Removing the three screws and cover will expose the CB 1 Control board. By turning the potentiometer knob located on the CB1 control board CCW (counterclockwise) will increase the speed of the ice delivery. Turning the potentiometer knob CW (clockwise) will decrease the speed of the ice delivery.
FIGURE 6. ICE AUGER SPEED CONTROL
15 | 620918702 |