3.Detach current valves:
–Remove front cover by lifting.
–Remove valve cover.
–Unplug wiring harness.
–Remove valve.
3.INSTALLATION CHECKLIST
1.Voltage and proper grounding.
2.Valve properly secured (latched) to block.
3.CO2 pressure to carbonator.
4.Water flow rate.
5.Syrup delivery pressure.
6.Finished product temperature less than 40°F.
7.Water to syrup ratio.
8.Portion size /
9.Water, syrup, CO2 leaks.
10.Cover secured to valve.
11.Valves flavor correctly marked.
4.RETROFITTING
Note: Replacement of mounting block inlet fitting
4.1 Mounting Block Removal
To remove valve mounting block from the front panel, take out and save 4 screws.
IMPORTANT: Before installing block replace
© | - 17 - |
INSTALLATION