Manuals
/
Cosco
/
Baby
/
Safety Gate
Cosco
manual
SLR SLC SLD Operator Installation Guide
Models:
SLR
SLC
SLD
1
37
40
40
Download
40 pages
23.52 Kb
33
34
35
36
37
38
39
40
<
>
Troubleshooting
Specs
Install
Maintenance
Limit NUT Adjustments
Dip Switches
Charger Board Sleep Mode
Page 37
Image 37
SLR • SLC • SLD OPERATOR INSTALLATION GUIDE
- 37 -
Page 36
Page 38
Page 37
Image 37
Page 36
Page 38
Contents
SLR SLC SLD
Table of Contents
SLR SLC SLD Operator Installation Guide
PRE-INSTALLATION Information
Safety Information
Gate Operator Classifications
Wiring Specifications
USE Copper Wire only
PAD Mounting Instructions for Models
SLR, SLC & SLD
Gate Bracket and Chain Assembly Instructions
Optional Torque Limiter Adjustments
Vent Plug Installation
To adjust the torque limiter in models SLR, SLC and SLD
Models SLR, SLC and SLD Optional
Limit NUT Adjustments
Electrical Connection and Adjustments
Dip Switches
Control Board Adjustments
Board Control With Motor
Close
Terminal Connection Descriptions
Close Direction Current Sense Adjustment
Current Sensing Adjustments
Open Direction Current Sense Adjustment
Multi-turn Potentiometer
Onboard L.E.D. Indicator Descriptions
Surge Protector Instructions
Important Notes for Installation MASTER/SLAVE Applications
Charger Board Sleep Mode
Control and Accessory Connection Illustrations
SLR SLC SLD Operator Installation Guide
SLR SLC SLD Operator Installation Guide
AC Models only
Loop Layout Illustration
Edge Layout Illustration #1
Edge Layout Illustration #2
Photo EYE Illustration
Picket Gate Illustration
Track Gate Illustration
Operator fails to start
Troubleshooting
Model SLR Mechanical Parts Exploded View
Description
Model SLR Mechanical Parts List
Model SLC Mechanical Parts Exploded View
Description
Model SLC Mechanical Parts List
Models SLR SLC Control BOX Parts List
Model SLD Mechanical Parts Exploded View
Model SLD Mechanical Parts List
Model SLD Control BOX Parts List
Brush Replacement
Battery Maintenance
Material Safety Data Sheet Mobil SHC
Imperial Oil
SLR SLC SLD Operator Installation Guide
General
Preventative Maintenance
This page intentionally left blank
Gate Operator Installation Checklist
Top
Page
Image
Contents