SLR • SLC • SLD OPERATOR INSTALLATION GUIDE

GATE OPERATOR INSTALLATION CHECKLIST

INSTALLER

CUSTOMER

 

 

________

________

1.

The gate has been checked to make sure it is level and moves freely in both directions.

________

________

2.

Potential pinch areas have been guarded so as to be inaccessible OR have contact and/or

 

 

 

non-contact obstruction sensing devices installed.

________

________

3.

The installer has installed one or more contact or non-contact obstruction sensing devices, in

 

 

 

compliance with UL325 requirements for this installation.

________

________

4.

The slide gate has been screened or secured from the bottom of the gate to a minimum of 48

 

 

 

inches above ground to prevent a 2 1/4-inch sphere from passing through the openings any-

 

 

 

where in the gate and in that portion of the adjacent fence that the gate covers when the gate

 

 

 

is in the open and closed positions. Picket gates which have spacings less than 2 1/4 inches

 

 

 

apart to the minimum height requirement are also acceptable.

________ ________

________ ________

5.Roller covers have been installed on cantilever gates.

6.If pedestrian traffic is expected, a separate pedestrian gate has been installed, a minimum of seven feet from the gate. The customer has been informed that all pedestrian traffic must use the pedestrian gate.

________ ________

7. Warning signs have been installed on each side of the gate in highly visible locations. The

 

customer has been informed that these signs must remain at all times.

________ ________

________ ________

8.There are no controls installed on the gate operator, or within seven feet of the gate.

9.The installer has properly adjusted the obstruction sensing feature and has tested the gate to make sure that the gate stops and reverses a short distance with minimal resistance applied (40 lbs. on a swing gate at the end of the gate, 75 lbs. on a slide gate)

________

________

10.

The installer has instructed the customer in the proper use of the gate operator and reviewed

 

 

 

all of the operational functions, obstruction sensing devices, warning beeper and reset, etc.

________

________

11.

The installer has instructed the customer in the proper use of the operator’s manual discon-

 

 

 

nect feature. The manual disconnect must never be used while the gate is in motion. The

 

 

 

power switch must be turned off before using the manual disconnect and disengaging the

 

 

 

operator.

________

________

12.

The installer has reviewed all safety instructions with the customer, and has left the safety

 

 

 

instructions and owner’s information sheets for their reference.

________ ________

________ ________

13.The installer has answered any questions the customer has regarding the operation of the gate operator and gate operator safety precautions.

14.The installer has explained to the customer that a regular maintenance schedule for both the gate and the gate operator is recommended.

By signing this installation checklist, I/we hereby certify that each item listed and checked above has been covered by the installer and is clearly understood by the customer.

______________________________________________

_____________________________

Customer Signature

Date

______________________________________________

_____________________________

Installer Signature

Date

- 40 -

Page 40
Image 40
Cosco SLD, SLR, SLC manual Gate Operator Installation Checklist