
STEP 3 Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8" larger than the support box outline.
STEP 4 Lower the support box through the hole in the roof until the bottom of the support box protrudes at least 2 inches below the ceiling. Align the support box in place through the inside walls and into the roof sheathing.
STEP 5 Using tin snips, cut the support box from the top corners down to the roof line, and fold the resulting flaps over the roof sheathing. Before nailing it to the roof, run a bead of
STEP 6 Complete the cathedral ceiling installation by following the same procedures outlined in Steps 4 through 9 for vertical terminations.
MAINTENANCE
The frequency of performing fireplace maintenance depends on
IMPORTANT: TURN OFF THE FIREPLACE AND SHUT OFF THE GAS BEFORE SERVICING ANY FIREPLACE.
SPECIFIC TASKS
CLEANING BURNERS AND CONTROLS FREQUENCY: Once during annual inspection. PERFORMED BY: Qualified service technician.
TASK PERFORMED: Clean the control compartment. Remove and clean logs (careful not to damage ceramic logs). While logs are removed, clean and inspect 3 burners, inspect and clean pilot assembly, and inspect and clean surrounding burner area.
REPLACE OLD EMBERS
FREQUENCY: Once during annual inspection.
PERFORMED BY: Qualified service technician.
TASK PERFORMED: Replace ember material with new ember material. Additional ember material can be purchased from a local authorized Country Flame Dealer. (Only use genuine Country Flame ember material)
Version 1.0h | 32 |