Craftsman CTS205 manual Cedar Impressions Bay Window Cornerposts, 109

Models: CTS205

1 149
Download 149 pages 55.18 Kb
Page 110
Image 110

CertainTeed Vinyl Siding Installation Guide

Cedar Impressions

Bay Window Cornerposts

When installing Bay Window Cornerposts, be sure to run Cedar Impressions Metal Starter to both corners, and install Cedar Impressions panels from right to left.

Install the Cedar Impressions panels into both the inside and outside cornerposts. Leave a 2.5" gap on each side of the corner.

Once the panel has been fastened, hook the cornerposts over the siding, making sure they are locked into the starter strip.

Nail through the top two holes of the Cornerpost.

Continue installing the Cornerpost as you move up the wall. When you reach the top panel, cut the Cornerpost to length and nail it with a color matched finish nail.

If the Cornerposts are installed before the siding, you will have to cut the Cedar Impressions panel to fit. To do this, measure from the edge of the last installed panel to the edge of the Cornerpost. Add 1-1/4" to this dimension, and cut the panel to length. Angle the panel under the Cornerpost and slide it to the left until the side tabs clear. Then slide the panel to the right until the correct temperature marks on the panel are lined up. Fasten the panel to the wall.

109

Page 110
Image 110
Craftsman CTS205 manual Cedar Impressions Bay Window Cornerposts, 109