xStack® DGS-3400 Series Layer 2 Gigabit Ethernet Managed Switch

Mounting the Switch in a Standard 19" Rack

Figure 2- 3. Installing Switch in a rack

Power On

1.Plug one end of the AC power cord into the power connector of the Switch and the other end into the local power source outlet.

2.After powering on the Switch, the LED indicators will momentarily blink. This blinking of the LED indicators represents a reset of the system.

Power Failure

As a precaution, in the event of a power failure, unplug the Switch. When power is resumed, plug the Switch back in.

10

Page 19
Image 19
D-Link ethernet managed switch manual Mounting the Switch in a Standard 19 Rack, Power On, Power Failure