Dansons Group FPP, IPP Installation Check List, Heat Tubes, Hopper, Tube Scraper, Auger, Window

Models: IPP Bay View Insert / Built-In FPP, IPP FPP Freestanding IPP, FPP

1 40
Download 40 pages 61.48 Kb
Page 9
Image 9
INSTALLATION CHECK LIST

INSTALLATION CHECK LIST

Unless you are knowledgeable and experienced in stove installation, we recommend your PELPRO stove receive a Pre-delivery Check and be installed by your local Specialty Retailer or Certified HVAC Service Depot.

COMPLETE THIS CHECK LIST PRIOR TO LIGHTING YOUR FIRST FIRE:

_____

Carefully read this "Owner's Manual”. SAVE THIS MANUAL.

_____

Obtain final inspection and approval by local building officials.

_____

Carefully clean all marks off the brass parts before the first fire is lit. Use a soft cloth and a gentle type

 

cleaner. Caution: Never use an abrasive cleaner on any part of your stove.

_____

Polish the hopper to remove the oil type coating used in manufacturing.

_____

Have your local Dealer demonstrate all the operational, cleaning and maintenance steps necessary

 

for your stove.

_____ Sign and keep a copy of the Pre-delivery Check List supplied by your Authorized Pelpro Dealer,

 

“Dansons Certified Installer”, found inside our appliance or available online.

 

Register online at www.dansons.com/support for Extended Warranty.

______

Register your purchase online at www.dansons.com/support.

_____

Fill the hopper with quality pellets to prime the unit; Using the CCI “AcuTron”, (figure 5), PUSH the

 

FEED RATE Touch Pad and this will start the auger and the combustion fan.

NOTE: Do not attempt to light a fire at this time. Leave the START / FEED RATE [ON] for 2 to 5 minutes until pellets start dropping into the burn grate. Then touch the OFF pad to turn off system . The auger is now primed to deliver fuel to the burn grate (figure 6). Then light the stove according to the directions outlined in "LIGHTING YOUR STOVE",

Heat Tubes

Hopper

 

Tube Scraper

Auger

 

Window

Auger Motor

 

Burn Grate

Fan Motors

Exhaust

Burn Pot

Air Intake

 

E Z Clean

Ash Pan

Grate

CCI –“AcuTron Board”

 

Cutaway View

Figure 3

 

Figure 4

Canadian Comfort Industries V04

9

PELPRO OWNERS MANUAL

Copyright 2004

www.pelprostoves.com

Dansons Group Inc.

Page 9
Image 9
Dansons Group FPP, IPP Installation Check List, Heat Tubes, Hopper, Tube Scraper, Window, Auger Motor, Burn Grate