7.Apply a bead of silicone sealant around flange of chute (H) Fig. 14. Align holes in eight-hole gasket (K) Fig. 14, with mounting holes in chute (H) and press gasket

(K) onto flange as shown.

8.Align mounting holes in left hand drum (N) Fig. 15, with gasket (K), assembled in STEP 7. Place a lockwasher onto a hex head screw, and insert screw through chute (H), thread screw into drum (N), and tighten securely as shown in Fig. 16. Repeat this process for the seven remaining holes.

9.Assemble the remaining eight hole gasket and right hand drum to the blower chute in the same manner.

10.Fig. 17, illustrates the drums assembled to the dust chute.

Fig. 16

Fig. 13

H

K

Fig. 14

K

H

N

Fig. 15

Fig. 17

7

Page 7
Image 7
Delta 50-853, 50-852 instruction manual