CONNECTING TO GAS SUPPLY

INSTALLATION

Continued

CONNECTING TO GAS SUPPLY

Manual background WARNING: This appliance requires a 1/2" NPT (National Pipe Thread) inlet connection to the pressure regulator.

Manual background WARNING: A qualified service personmustconnectheatertogas supply. Follow all local codes.

Manual background CAUTION:Neverconnectpro- pane/LP fireplace directly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the exter- nal regulator between the heater and propane/LP supply.

Manual background WARNING: Never connect natural gas fireplace to private (non-utility) gas wells. This gas is commonly known as wellhead gas.

Installation Items Needed

Before installing heater, make sure you have the items listed below.

external regulator (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the optional CSA design-certified equipment shutoff valve from your dealer. See Accessories, page 27.

For propane/LP units, the installer must supply an external regulator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incoming gas pres- sure, heater regulator damage could occur. Install external regulator with the vent pointing down

as shown in Figure 13. Pointing the vent down protects it from freezing rain or sleet.

Manual background CAUTION:Useonlynew,black ironorsteelpipe.Internally-tinned copper tubing may be used in certain areas. Check your local codes.Usepipeof1/2"diameteror greatertoallowpropergasvolume toheater.Ifpipeistoosmall,undue loss of volume will occur.

Installation must include an equipment shutoff valve, union and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from heater (see Figure 14, page 14).

IMPORTANT: Install equipment shutoff valve in an accessible location. The equipment shutoff valve is for turning on or shutting off the gas to the appliance.

Check your building codes for any special requirements for locating equipment shutoff valve to fireplaces.

Apply pipe joint sealant lightly to male NPT threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged heater valves.

Manual background WARNING: Use pipe joint sealant that is resistant to liquid petroleum (LP) gas.

We recommend that you install a sediment trap in supply line as shown in Figures 14, page 14. Locate sediment trap where it is within reach for clean- ing. Install in piping system between fuel supply and heater. Locate sediment trap where trapped matter is not likely to freeze. A sediment trap traps moisture and contaminants. This keeps them from going into heater controls. If sediment trap is not installed or is installed wrong, heater may not run properly.

 

Propane/LP

External

Supply Tank

 

Regulator

 

Vent

Pointing

Down

Figure 13 - External Regulator With Vent

Pointing Down