Desa CHL3924NR installation manual Installation, Connecting To Gas Supply

Models: CHL3924NR

1 36
Download 36 pages 63.16 Kb
Page 13
Image 13
CONNECTING TO GAS SUPPLY

Installation

Continued

CONNECTING TO GAS SUPPLY

Manual background WARNING: This appliance requires a 1/2" NPT (National Pipe Thread) inlet connection to the pressure regulator.

Manual background WARNING: A qualified ser- vice person must connect heater to gas supply. Follow all local codes.

Manual background CAUTION: Never connect propane/LPheater directly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the exter- nal regulator between the heater and propane/LP supply.

Manual background WARNING: Never connect natural gas heater to private (non-utility) gas wells. This gas is commonly known as wellhead gas.

Installation Items Needed

Before installing heater, make sure you have the items listed below.

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the optional CSA design-certified equipment shutoff valve from your dealer. See Accessories, page 34.

For propane/LP units, the installer must supply an external regulator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11" and 14" of water. If you do not reduce incoming gas pres- sure, heater regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure 13. Pointing the vent down protects it from freezing rain or sleet.

Manual background CAUTION: Use only new, black iron or steel pipe. Inter- nally-tinned copper tubing may be used in certain areas. Check your local codes. Use pipe of 1/2" diameter or greater to allow proper gas volume to heater. If pipe is too small, undue loss of volume will occur.

Installation must include an equipment shutoff valve, union and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from heater (see Figure 14, page 14).

IMPORTANT: Install equipment shutoff valve in an accessible location. The equipment shutoff valve is for turning on or shutting off the gas to the appliance.

Check your building codes for any special re- quirements for locating equipment shutoff valve to fireplaces.

Apply pipe joint sealant lightly to male NPT threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged heater valves.

Propane/LP

Supply Tank

External

Regulator

Vent

Pointing

Down

Figure 13 - External Regulator With Vent

Pointing Down

111161-01H

www.desatech.com

13

Page 13
Image 13
Desa CHL3924NR installation manual Installation, Connecting To Gas Supply