Desa H) AND VM42(B, M36P, M42P Wall Switch Installation, Installing Receiver, Control Unit

Models: H)

1 28
Download 28 pages 27.94 Kb
Page 10
Image 10
INSTALLATION

10

INSTALLATION

WALL SWITCH INSTALLATION

The installation of a wall switch allows you to activate the gas control valve without the normal household electricity since the valve operates on millivolt current supplied by the heat generated by the thermopile. To install the wall switch:

1.

Remove the front refractory access panel by lifting up and

 

angling out of the firebox opening (see Figure 13).

2.

Use wire and connectors provided. Attach red wire to terminal

4.Connect wires to control circuit. Connect white wire to termi- nal marked TH/TP on control valve. Connect red wire to male blade connector provided at open end of safety circuit wiring (see Wiring Diagram, page 18).

5.Locate the battery clip mounted on the back of the receiver (see Figure 16).

6.Slide 9-volt battery (not included) through the clip. Note: Only use alkaline battery.

7.Attach the terminal wires to the battery (see Figure 16).

8.Replace refractory brick access panel.

marked TH/TP on control valve. Attach white wire to blade

connector on open end of safety circuit wiring (see Wiring

Diagram, page 18).

Note: If any of the original wire from the unit control must be re- placed, use the same type or a higher rated wire (25 ft. maximum length).

WALL SWITCH INSTALLATION WARNING: Do not wire remote wall switch to main power supply (Standard 120v household current).

3.

Locate wall switch in a convenient location.

IN

 

ON

LO

T

 

I

 

P

 

FFO

IN

OUT

To Safety Circuit

Route Millivolt

Wall Switch

Wires (Supplied)

(Supplied)

 

 

Through Gas Line

 

 

Conduit Sleeve

 

 

To Thermopile

 

TH

 

 

TP

 

 

THTP

 

 

 

 

(Back View

4.

After wire connections are complete, replace refractory access

 

panel.

Note:Ifanyoftheoriginalwireassuppliedmustbereplaced,use18AWG TYPE CL2 (UL) 105 C (25 ft. length MAXIMUM) or equivalent.

Figure 13 - Removing Front Refractory Access Panel

OPTIONAL WIRELESS HAND-HELD REMOTE CONTROL INSTALLATION

Note: If using optional wireless hand-held remote control, the wall switch is no longer operational.

Installing Receiver

1.Remove the front refractory access panel by lifting up and angling out of the firebox opening (see Figure 13) to expose controls.

2.Disconnect wall switch wires from TH and TH/TP terminals on control valve (see Figure 14).

3.Install remote receiver unit onto mounting bracket using the two plastic mounting clips (see Figure 15).

Figure 14 - Wall Switch Wiring Diagram

 

 

9-Volt Battery

Receiver

Battery

 

 

 

 

Clip

 

Plastic

Terminal

 

Mounting

 

Wires

 

Clips

 

 

 

Mounting Bracket

 

Receiver

 

 

Figure 15 - Installing Remote

Figure 16

- Installing Battery

Receiver (Shown from Rear of

in Receiver

Mounting Bracket)

 

 

Installing 9-Volt Battery in Hand-Held Remote

Control Unit

 

 

1.Remove battery cover on back of remote control unit.

2.Attach terminal wires to the battery (not included). Place battery into the battery housing. Note: Only use alkaline battery.

3.Replace battery cover onto remote control unit.

Battery Cover

Remote Control Unit

 

Terminal Wires

 

9-Volt

 

Battery

 

 

Battery

 

Housing

Figure 17 - Installing Battery in Hand-Held Remote Control Unit

Installing ReceiverInstalling 9-Volt Battery in Hand-Held RemoteControl UnitManual backgroundManual backgroundManual backgroundManual backgroundFor more information, visit www.desatech.comManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

108795-01M

Page 10
Image 10
Desa H) AND VM42(B, M36P Wall Switch Installation, Installing Receiver, Installing 9-VoltBattery in Hand-HeldRemote