Desa TD100, TD102, TD104, TD110, Td104, Td102 Assembly, Operation, Continued, Heater assembly

Models: TD100, TD102, TD104, TD110 Td100 Td102 Td104

1 52
Download 52 pages 39.9 Kb
Page 7
Image 7
Heater assembly

Assembly

Continued

Heater assembly

Note: If needed, acquire assistance lifting assembly.

1.Place entire lightpost assembly on top of cabinet base assembly. Attach with 4 screws (H) as shown in Figure 8. Install 2 screws (H) into holes on each side of control valve. Attach control valve nut and control knob to control valve.

2.Connect 2 brown wires to ON/OFF switch.

3.Connect white ground wire attached to cabinet to right post on electronic ignitor. Remove wire tie. Connect black ignitor wire to left post on electronic ignitor. Install battery in ignitor as shown on page 12.

4.Install batteries in battery holder as shown on page 12. Do not mix batteries.

5.Connect regulator to gas cylinder, see Operation. Gas cylinder will sit inside of cabinet assembly.

6.Check for leaks. See Checking for Leaks page 8.

7.Attach fourth lightpost panel to assembly with 6 screws (H) as shown in Figure 7, page 6.

Operation

Lightpost/

Burner

Assembly

 

Control

 

Valve

 

Control

 

Valve Nut

Chain

and Control

Retainer

Knob

 

Cabinet

 

Assembly

 

Ignitor

 

ON/OFF

 

Switch

Figure 8 - Attaching Lightpost/Burner

Assembly to Cabinet Assembly

Operation CAUTION: Do not stand in front of heater while lighting. Stand at the side when lighting the heater.

Use only a 20 lb. propane/LP cylinder (not included). See safety information for proper cylinder selection. Connect the hose/regula- tor assembly to the cylinder (see Figure 9). The hose should already be connected to the heater. Connect hose to the valve inlet (see Figure 9). Tighten firmly using a wrench.

Route retention chain through at least one of the handles of the propane/LP tank (see Figure 9). Make sure to route chain through handle on tank and NOT around tank valve. Chain must not interfere with valve. Attach hooks on both ends of chains to chain retain- ers installed on cabinet base (see Figure 8).

 

Retention

Valve Inlet

Chain

 

Hose/Regulator

Assembly

20 lb.

Propane/LP

Cylinder

Figure 9 - Connecting Hose/Regulator
Assembly to Propane/LP Cylinder

118994-01Gwww.desatech.com

Page 7
Image 7
Desa TD100, TD102, TD104, TD110, Td104, Td102 Assembly, Operation, Continued, Heater assembly, Attaching Lightpost/Burner