6
Framing (Cont.)
PREPARATION
Continued
The gas supply line may be connected through the side framing or alternately through the lower
1" (2.5cm)
Dia. Hole
Platform Must Be
Solid, Flat, and
Fully Supported
| " |
|
/8 | ) | |
5 |
| |
(60cm | ||
23 |
|
|
39 3/4"
(101cm)
Min.
40 | 1 |
|
(102. |
| |
| / | |
|
| 2" |
| 9cm) |
*
|
| .5cm) |
|
| 1" |
|
| (2 |
|
| 3" |
2" (5.1cm) |
| (7.6cm) |
Dia. Hole | .1cm) |
|
|
| |
| 2" |
|
| (5 | 3" (7.6cm) |
|
|
Figure 10 - Hole Locations For Gas Line and Electric Wires for Peninsula and
10"
(25.4cm) Square Min.
Figure 8 - Rough Opening for Installing Peninsula Fireplace on
Platform
* As required by design as long as ceiling clearance is maintained.
Height
Depends On
Installation
Figure 11 - Rough Opening for Installing Exterior Vent Terminal
|
| " |
|
|
|
| /8 | ) |
|
| |
| 5 |
|
|
| |
| (60cm |
|
| ||
| 39 3/4" | ||||
| 23 |
|
|
|
|
|
|
|
| (101cm) | |
|
|
|
| Min. | |
43 | 1 |
|
|
|
|
|
|
|
| ||
|
|
|
| ||
(109./4" |
|
|
|
| |
| 8cm) |
|
|
|
|
Figure 9 - Rough Opening for Installing
Vertical Height
Depends on
Installation
90o Elbow
45o
Elbow
263/8"
(67cm)
Refer to Pages 10 through 16 for Horizontal and Vertical Installation Details
Horizontal
Length Depends
on Installation
Figure 12 - Vent Opening Height
For..com