Venting Installation

Continued

parts list for venting kits and components

DESA (5"/8") Pipe & Vent Kits

Number

Description

P58-6

6" Section Double Wall Pipe,

 

Galvanized

P58-12

12" Section Double Wall Pipe,

 

Galvanized

P58-24

24" Section Double Wall Pipe,

 

Galvanized

P58-36

36" Section Double Wall Pipe,

 

Galvanized

P58-48

48" Section Double Wall Pipe,

 

Galvanized

PA58-712

Adjustable 7"-12" Section Double

 

Wall Pipe, Galvanized

E58-45

45° Elbow, Galvanized

E58-90

90° Elbow, Galvanized

HTS-58

Horizontal Square Termination,

 

Galvanized

VT-58

Vertical Round Termination,

 

Galvanized

SC-58

Storm Collar, Galvanized

WF-58

Wall Firestop, Galvanized

RF-58-6

Roof Flashing - 0 to 6/12 Pitch,

 

Galvanized

RF-58-12

Roof Flashing - 6/12 to 12/12 Pitch,

 

Galvanized

VR-58

Vertical Restrictor, Galvanized

S-58

Vinyl Siding Standoff,

 

Galvanized

WS-58

Wall Strap

CS-58

Cathedral Ceiling Support

FP-58

Firestop Plate

SF-58

Stucco Flashing -

 

For use with HTS-58

RF-58

Flat Roof Flashing

AK6-37

37" Outside Air Flex Vent Kit

AK6-75

75" Outside Air Flex Vent Kit

Fireplace

Installation

CHECK GAS TYPE

Use proper gas type for the fireplace unit you are installing. If you have conflicting gas types, do not install fireplace. See retailer where you purchased the fireplace for proper fireplace according to your gas type.

Installing Gas Piping to Fireplace Location

WARNING: A qualified service person must connect fireplace to gas supply. Follow all local codes.

CAUTION: For propane/LP units, never connect fireplace directly to the propane/LP sup- ply. This heater requires an ex- ternal regulator (not supplied). Install the external regulator between the fireplace and pro- pane/LP supply.

WARNING: For natural gas, never connect fireplace to private (non-utility) gas wells. This gas is commonly known as wellhead gas.

Installation Items Needed

Before installing fireplace, make sure you

have the items listed below.

external regulator (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

approved flexible gas line with gas connec- tor (if allowed by local codes)

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable al- ternative to test gauge connection. Purchase the CSA design-certified equipment shutoff valve from your retailer.

14

www.desatech.com

120441-01A

Page 14
Image 14
Design Dynamics DVF-36S-N Fireplace Installation, Parts list for venting kits and components, Check GAS Type