2000 Owner’s Manual
16
1)Remove the screws holding the equipment access panel to the front of the spa cabinet and set the panel aside.
2)Loosen the four screws located on the front of the black equipment control can and remove the door from the control can to allow access to the four wire connection terminal block.
3)Attach 1” rigid
4)Connect the four wires to the equipment system terminal block (TB1) as indicated on the wiring diagram in the back of this manual.
5)Configure jumpers 1 and 2 on the upper right corner of the PC Board to match the circuit size being used for the spa (see Electrical Requirements Chart on previous page for proper wire size). See the chart below for the correct settings.
1 | 2 | 1 | 2 |
| JMP1 |
| JMP1 |
| JMP2 |
| JMP2 |
30 A Circuit | 40 A Circuit | ||
1 | 2 | 1 | 2 |
| JMP1 |
| JMP1 |
| JMP2 |
| JMP2 |
15 A Circuit | 50 A Circuit |
6)Replace the door on the control can and
7)Electrical
If you have an Aurora HP, Interlude, Arena or Triad or please read below for Initial