Cold Weather Operation:

OPERATION

PB-770 H/T

 

 

Cold Weather Operation:

1.Remove back cushion (A) from frame.

2.Install intake cover (B) on frame over air intake.

3.Install back cushion (A) to frame over intake cover. Note: Blower performance may be reduced slightly.

A

B

22

X7531123904

© 4/2013 ECHO Inc.

Page 22
Image 22
Echo PB-770 H/T Cold Weather Operation, Remove back cushion A from frame, Install intake cover B on frame over air intake