Enviro C-11150 technical manual Installation, Remove the cab sides and ash pan cover

Models: C-11150

1 34
Download 34 pages 57.64 Kb
Page 7
Image 7
1.Remove the cab sides and ash pan cover.

Installation

APPLIANCE DIMENSIONS AND SPECIFICATIONS:

15 1/2"

(393 mm)

Weight (with full hopper): 238 lb (108 Kg)

Hopper Capacity: up to 48 lb (21.8 Kg)

Voltage: 110 - 120 V

Max Current: 4.1 Amps

Consumption on High: 3.1 lb/hr (1.4 Kg/hr)*

Consumption on Low: 1.3 lb/hr (0.6 Kg/hr)*

(Note: Consumption will vary with the type of fuel used.)

17 7/8"

(455 mm)

34"

(864 mm)

17 1/2"

(444 mm)

18 1/2"

(470 mm)

18 7/8"

(481 mm)

19 5/8"

(497 mm)

22 1/8"

(562 mm)

Figure 2: Dimensions of Mini.

HEARTH PAD (50-1219) INSTALLATION:

1.Remove the cab sides and ash pan cover.

2.Slide the hearth pad back into place until front tab touches the base.

3.Locate the five (5) screw holes (see Figure 3) and install #8-32 torx T-20 screws and tighten.

4.Adjust the leveling legs to level and support stove.

5.Re-install the cab sides and ash pan cover.

Figure 3: Mini Hearth Pad in Place.

7

Page 7
Image 7
Enviro C-11150 technical manual Installation, Remove the cab sides and ash pan cover