Installation

Please read and understand these instructions before installing pedestal or ash pan and leg option. Failure to follow these instructions carefully could cause personal injury or property damage. All screws are pre-installed on the base of the unit.

REMOVAL FROM PALLET:

Remove the bricks from the unit before starting.

Remove the two (2) lag bolts (shown in Figure 6) that secure the unit to the pallet from inside the firebox.

Note: Before the bricks are installed, rivets

(Figure 2) must be placed in the two (2) holes (shown in Figure 7) in the firebox that lag bolts came out of. This is done to make unit burn more efficiently.

Figure 7:

Rivet.

Figure 6: Bolts to remove.

MODIFICATIONS FOR INSTALLATION WITH 191/16” (484MM) HIGH LINTEL:

The Venice has a factory height of 199/16” (497mm) and it can be reduced to 191/16” (484mm) by modifying the unit and the surround panel.

Insert Unit:

1. Remove the thirteen T-20 screws holding the cabinet top in place (refer to Figure 8).

2. Remove the cabinet top and flip it onto its top.

3. Remove the Air Deflector (shown in Figure 9) by removing the two (2) T-20 screws.

4. Re-install the cabinet top onto the unit. The screw holes along the top of the unit should now line up with the top set of holes on the cabinet top.

Figure 8: Removing Cabinet Top from Unit.

Air Deflector

Insert Cabinet Top

Figure 9: Removing Air Deflector onto Cabinet Top.

15

Page 15
Image 15
Enviro Venice, 1700-V Insert, 1200-V Insert owner manual Installation, Insert Unit