19

13

12

14

 

20

 

 

15

21

18

17

16

Fig. 1E

12.Caster (4)

13.Intake cap and ring (4)

14.Knob for attaching legs to blower/motor assembly (6)

15.3/8” (9.5mm) Flat washer for knobs (6)

16.5/16” (9mm) Small flat washers for casters (16)

17.M4 Sheet metal screw for dust intake port (4)

18.5/16”x3/4” Hex head screw for attaching casters to base (16)

19.5/16” (8mm) Lock Nut (2)

20.5/16” (8mm) x 11/2” Hex head screw for bag hanger assembly (2)

21.5/16” (8mm) Large washers for bag hanger assembly (4)

UNPACKING AND CLEANING

Carefully unpack the machine and all loose items from the shipping container(s). Remove the rust-preventative oil from unpainted surfaces using a soft cloth moistened with mineral spirits, paint thinner or denatured alcohol.

Do not use highly volatile solvents such as gasoline, naphtha, acetone or lacquer thinner for cleaning your machine.

After cleaning, cover the unpainted surfaces with a good quality household floor paste wax.

ASSEMBLY

ASSEMBLY TOOLS REQUIRED

Phillips head screwdriver

12 mm wrench

ASSEMBLY TIME ESTIMATE

Assembly for this machine takes approximately 1-2 hours.

8-English

Page 8
Image 8
Epson 50-764 instruction manual Unpacking and Cleaning, Assembly Tools Required, Assembly Time Estimate