
Pinout of straight patch cable
1.14 FINAL INSTALL PROCESS
Once you have completed the basic wiring connections, you are ready to turn on the DVR. Simply plug in the power source. The POWER LED will light up if power is normal. Once the system has finished loading, you can begin to set up the menu options for the DVR.
Note: When the DVR is placed in an environment where the temperature is under
20