Contents
Introduction | 1 |
About the Cable Cubby 300, 600, and 800 | 1 |
Features | 3 |
Installation | 4 |
Installation Overview | 4 |
Preparing the Routing Template | 4 |
Preparing the Table | 5 |
Preparing the Table with a Router | 6 |
Preparing the Table with a Hole Saw |
|
(Cable Cubby 300C only) | 7 |
Installing the Cables and AAPs | 7 |
AAP Shelf Brackets | 7 |
Installing the Power Module | 8 |
Installing the Cables | 9 |
Installing the AAPs | 10 |
Installing the Shelf Assembly | 10 |
Mounting the Cable Cubby | 10 |
Maintenance and Modifications | 12 |
Removing and Replacing the Cable Cubby | 12 |
Replacing Cables or an AAP | 14 |
Adding an Additional Power Module |
|
(CC 600 and CC 800) | 14 |
Reference Information | 18 |
Cable Cubby Part Numbers | 18 |
Included Parts | 19 |
Replacement/Modification Part Numbers | 19 |
Routing Template Part Numbers | 19 |
Top Plate Dimensions | 20 |
Extron Warranty |
|
Cable Cubby 300/600/800 • Contents | v |