Extron electronic SCP 150L user manual Installation and Operation, Introduction, Scp, Features

Models: SCP 150L

1 23
Download 23 pages 25.68 Kb
Page 5
Image 5

Introduction

About the SCP 150, SCP 150 AAP, and SCP 150 L

The Extron SCP 150, SCP 150 AAP, and SCP 150 L are hardwired remote control panels for the Extron System 5 IP switcher. All models replicate the switcher’s volume, input switching, and system controls. The SCP 150 AAP also provides four spaces for the addition of optional architectural adapter plates (AAPs) or audio, relay, or IR control modules (ACMs, RCMs, IRCMs).

Unless otherwise noted or implied, the term “SCP” refers to all three models of the SCP 150 (SCP 150, SCP 150 AAP, and SCP 150 L).

The System 5 IP cannot be configured from the SCP control panels. All switcher setup must be done from the switcher or via RS-232. Refer to the System 5 IP manual for information on setting up the switcher.

The System 5 IP supports up to two SCPs. Up to four control modules and one IR Link infrared signal repeater can be daisy- chained with the panels. The SCP accepts signals from the optional IR 402 remote control.

The panels can be mounted in or on walls or furniture. The SCP 150 mounts in a 2-gang electrical box, surface mount box, or mounting bracket and the SCP 150 AAP mounts in a 4-gang electrical box, surface mount box, or mounting bracket.

The SCP 150 L fits into a compact lectern space, into a wall, or into an Extron UCM RAAP or UCM 10X8P faceplate.

Features

Gray, black, white, and RAL9010 white faceplates — The SCPs are available in four colors for integration into a variety of environments.

Customizable, illuminated buttons — The panel buttons can be easily identified, even in low light.

System expandability — The panels can be daisy-chained with Extron’s control modules (IRCMs, ACMs, RCMs) and an IR Link to provide versatile remote control options.

Furniture and wall mountability — The SCPs can be mounted

in or on walls or furniture with the use of optional electrical boxes, surface mount boxes, or mounting brackets.

SCP 150

Chapter2Two

Installation and Operation

Installation Overview

Installing or Replacing Button Labels

Mounting Options

UL Requirements

Preparing the Site

Installing the Electrical Box

Cabling the Rear Panel

Pre-installation Testing/Troubleshooting

Mounting the SCP

Front Panel Features

Resetting to Factory Firmware Version

1-2 SCP 150 • Introduction

Page 5
Image 5
Extron electronic SCP 150L Installation and Operation, Introduction, Scp, About the SCP 150, SCP 150 AAP, and SCP 150 L