Raypak Y-200 manual Controller Familiarization, Installation Verification Procedure, Register

Models: Y-200

1 40
Download 40 pages 56.96 Kb
Page 12
Image 12
Installation Verification Procedure

Installation Verification Procedure

Register

Before proceeding any further, please verify that the user registration form has been completed and mailed.

Mechanical Installation

Verify that the mechanical installation has been completed in accordance with the instructions.

Outdoor Air Temperature Sensor

Verify that all Outdoor Air Temperature Sensor installation parameters have been met.

Water Temperature Sensor

Verify that the Water Temperature Sensor installa- tion parameters have been met.

Optional Equipment

Verify that optionally ordered equipment installa- tion parameters have been met.

System Module Installation

Verify electrical power wiring connections.

Verify electrical connection torque requirements.

Verify Outdoor Air Temperature Sensor wiring.

Verify Water Temperature Sensor wiring.

Verify Power Test has been completed successful- ly.

CONTROLLER

FAMILIARIZATION

This system is configured utilizing a LCD display (2 lines, 20 characters each) with keypad for data entry. Open the front cover of the Control Box for access to the LCD display and keypad. Open the control panel to gain access to the interface connections.

REFER TO THE TABLES ON THE FOLLOWING PAGES AND THE DISPLAY SCREENS FOR DETAILED CONFIGURATION INSTRUCTIONS.

NOTE: Controller is shipped with factory defaults. your system may require different program settings.

12

Page 12
Image 12
Raypak Y-200 manual Controller Familiarization, Installation Verification Procedure, Register, Mechanical Installation