Power to the Controller

Power to the Controller

Controller Field Wiring

Observe (follow proper) polarity.

Observe proper wire colors while making electrical connections.

Provide an external surge suppressor capable of maintaining system integrity.

Provide overload protection and a disconnect means for equipment serviceability as required by local and state code.

Conduit cannot be used as the ground. (There must be a “WIRED” ground.)

Very Important: A grounding electrode con- ductor shall be used to connect the equipment grounding conductors, the equipment enclosures, and where the system is grounded, the grounded service conductor to the grounding electrode.

For Single-Stage (ON/OFF) Boilers

All stage connections on the control board are con- nected at the {TH} (Thermostat) location on the boiler wiring diagram.

For Multiple-Stage Boilers

First stage connections on the control board are con- nected at the {TH} (Thermostat) location on the boiler wiring diagram. Second (or third, etc.) stage connec- tions on the control board are connected at the locations shown on the boiler wiring diagram.

Fig. 2: Wiring Diagram