Installation and Operation, cont’d

4.

Repeat steps 2 and 3 on the other side of the YCS.

5.

Hold the unit with the attached brackets against the

 

underside of the table or other furniture. On the mounting

 

surface, mark the location of the bracket’s screw holes.

6.

Drill 3/32" (2 mm) diameter pilot holes, 1/4" (6.3 mm)

 

deep in the mounting surface at the marked screw

 

locations.

7.

Insert #8 wood screws into the four pilot holes. Tighten

 

each screw into the mounting surface until slightly less

 

than 1/4" of the screw head protrudes.

8.

Align the mounting screws with the slots in the brackets

 

and place the unit against the surface, with the screws

 

through the bracket slots.

9.

Slide the unit slightly forward or back, then tighten all four

 

screws to secure it in place.

Projector mounting using the PMK 450

The Extron PMK 450 Multi-Product Projector Mounting Kit (part #70-618-02 or #70-618-03) can accommodate multiple Extron products of various sizes and their power supplies.

Top Plate (1)

Pipe Collar (1) and

Set Screws (4)

AC Power Cord

Access Slot

Front Plate (1)

Security Screw (2)

Rear Plate (1)

 

Extron

YCS SW2 A

Transcoding

Switcher

Bottom Plate (1)

Filler Plate (1)

Figure 2-7 — Components of the Extron PMK 450 kit

2-8 YCS SW2 A • Installation and Operation

Two tools are included with the PMK 450 kit:

A set-screw hex wrench

A security screw hex wrench

To projector-mount the YCS SW2 A using the PMK 450,

1.Unscrew the front and rear plates and the security screws from the sides of the PMK 450.

2.

Slide the top and bottom plates apart.

3.

Loosen the four pipe collar set screws to allow the top

 

plate to move freely along the pole.

4.

Ensure that the mounting pipe is installed with the cable

 

access hole facing the rear, away from the projector screen.

5.

Slide the top plate up the pipe until the pipe collar is

 

positioned just above the cable access hole. Ensure the rear

 

of the top plate is facing to the rear, in the same direction as

 

the cable access hole in the pipe.

Pipe Collar and

Set Screws

FRONT

REAR

Figure 2-8 — Positioning the top plate on the pipe

6.

Level the top plate and secure it by fully tightening the set

 

screws. At least three screws must come in contact with

 

the pipe.

7.

Route the cables for the devices to be mounted so that the

 

cables exit the pipe through the cable access hole.

YCS SW2 A • Installation and Operation

2-9

Page 11
Image 11
Extron electronic YCS SW2 A user manual Projector mounting using the PMK, Components of the Extron PMK 450 kit