PTAC Installation Recommendations

920-087-02 (9-03)

PTAC Installation Recommendations

For proper PTAC unit performance and maximum operating life please refer to the minimum installation clearances below:

Figure 1

PTAC units should be installed no closer than 12" apart when two units are side by side. If three of more PTAC units are to operate next to one another allow a minimum of 36" between units. Also, a vertical clearance of 60" should be maintained between units installed.

 

THREE OR MORE PTACs

VIEW: OUTSIDE

ADJACENT 36" MINIMUM

BUILDING ELEVATION

 

TYP.

 

WINDOW

 

36"

 

60"

TWO ADJACENT

PTACs 12" MINIMUM

 

60" VERTICAL MIMUMUM

 

BETWEEN PTACs

GROUND FLOOR PTACs

 

 

6" MINIMUM FROM GRADE

12"

6"

Figure 2

For PTACs on the ground floor or anytime obstructions are present, use the following guidelines:

For minor obstructions such as lamp poles or small shrubbery a clearance of 12" from the outdoor louver should be maintained.

For major obstructions such as a solid fence, wall or other heat rejecting device like a condensing unit, a minimum distance of 36" should be kept.

 

TYP. BUILDING ( PLAN VIEW )

 

 

36"

 

36"

 

PTAC

 

PTAC

 

PTAC

 

 

12"

 

 

12" MINIMUM, MINOR

POLE

36"

SHRUB

 

OBSTRUCTIONS

 

 

36" MIMUMUM, MAJOR

 

 

 

 

OBSTRUCTIONS

 

FENCE OR WALL

 

 

 

 

 

CONDENSING UNIT

 

 

The above suggestions are for reference only and do not represent all possible installations. Please contact the factory for information regarding affects of other installation arrangements. By following these simple recommendations you can be confident that your Friedrich PTAC will provide years of worry free operation.