HCP
3 Power Up
ALL ELECTRICALLY OPERATED APPLIANCES MUST BE ELECTRICALLY GROUNDED IN ACCORDANCE WITH LOCAL CODES, OR IN THE ABSENCE OF LOCAL CODES, WITH NATIONAL ELECTRIC CODE, ANSI/NFPA NO.
A.Power Requirements:
•Voltage – 208/240 VAC
•2620 Watts @ 208V – 3420 Watts @ 240V
•Frequency – 50/60 Hertz
•Single Phase
•20 amp Service
THIS APPLIANCE IS EQUIPPED WITH A
B.Plug the HCP into the power source.
C.Place the power switch in the ON position. All control displays will illuminate green approximately 2 seconds after the power switch is activated.
D.Monitor the temperature of the slots. The time it takes the slot(s) to heat from ambient (room) temperature to a 155°F (68°C) setpoint should be approximately 15 minutes. It should take approximately 25 minutes to reach a 200°F (93°C) setpoint. If setpoint is not consistently achieved within these limits, call your local Factory Authorized Service Center for repair.