Frymaster HCP operation manual Power Up

Models: HCP

1 30
Download 30 pages 33.93 Kb
Page 7
Image 7
3 Power Up

HCP

3 Power Up

ALL ELECTRICALLY OPERATED APPLIANCES MUST BE ELECTRICALLY GROUNDED IN ACCORDANCE WITH LOCAL CODES, OR IN THE ABSENCE OF LOCAL CODES, WITH NATIONAL ELECTRIC CODE, ANSI/NFPA NO. 70-1990.

A.Power Requirements:

Voltage – 208/240 VAC

2620 Watts @ 208V – 3420 Watts @ 240V

Frequency – 50/60 Hertz

Single Phase

20 amp Service

THIS APPLIANCE IS EQUIPPED WITH A THREE-PRONG GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INTO A PROPERLY GROUNDED THREE-PRONG RECEPTACLE. DO NOT CUT OR REMOVE THE GROUNDING PRONG FROM THIS PLUG.

B.Plug the HCP into the power source.

C.Place the power switch in the ON position. All control displays will illuminate green approximately 2 seconds after the power switch is activated.

D.Monitor the temperature of the slots. The time it takes the slot(s) to heat from ambient (room) temperature to a 155°F (68°C) setpoint should be approximately 15 minutes. It should take approximately 25 minutes to reach a 200°F (93°C) setpoint. If setpoint is not consistently achieved within these limits, call your local Factory Authorized Service Center for repair.

3-1

Page 7
Image 7
Frymaster HCP operation manual Power Up