TABLE 1-1 Checklist (3 of 3)

Requirements

Item

Check

Facility power

Do you know the required operating voltages and electrical current

 

levels of the device and peripherals?

 

See Section 2.2, “Electrical Specifications” on page 2-4

 

Are enough power outlets provided for the server cabinet, monitors, and

 

peripherals?

 

Are the circuit breakers for the device suitable in terms of voltage and

 

current-carrying capacities?

 

See Section 2.4, “Facility Power Requirements” on page 2-12

 

If you use single-phase power feed, is a power outlet located within 3.0

 

meters (9.8 feet) of the device?

Chapter 1 Physical and Network Specifications 1-3