TABLE 2-4Specifications (Single-Phase Power Requirements) (2 of 2)

 

Power supply

 

 

 

 

 

 

Circuit

 

 

 

 

Power

Apparent

 

Rush

Leak

breaker

 

Voltage

 

Frequency

consumption

power

Power

current

current

capacity

Name

[V]

Phase

[Hz]

[kW]

[kVA]

factor

[A0-p]

[mA]

[A]

 

 

 

 

 

 

 

 

 

 

Power Cabinet

200 to

Single

50/60

42.6 5

44.8 5

0.9 or

100 or

4.1 or

30 7

SPARC

240

 

+2%, -4%

 

 

higher

less 6

less 6

 

Enterprise

VAC

 

 

 

 

 

 

 

 

M9000 Server

±10%

 

 

 

 

 

 

 

 

(base cabinet +

 

 

 

 

 

 

 

 

 

expansion

 

 

 

 

 

 

 

 

 

cabinet) 1

 

 

 

 

 

 

 

 

 

Rack-

200 to

 

 

10.5 2

11.0 2

0.9 or

100 or

4.1 or

30 7

mountable

240

 

 

 

 

higher

less 6

less 6

 

Dual Power

VAC

 

 

 

 

 

 

 

 

Feed

±10%

 

 

 

 

 

 

 

 

(for SPARC

 

 

 

 

 

 

 

 

 

Enterprise

M8000 Server)

1This value represents when power feed is through the Power Cabinet alone.

2This value is reached when four CMUs and four IOUs are installed.

3The 100V power supply is used only for the FST, and this specification applies only to use in Japan.

4This value is reached when eight CMUs and eight IOUs are installed

5This value is reached when 16 CMUs and 16 IOUs are installed.

6This value represents the current for each cable.

7This value represents the capacity of a system main line switch for each power supply of the single-phase power supplies.

2-6SPARC Enterprise M8000/M9000 Servers Site Planning Guide • September 2007