TABLE
| Power supply |
|
|
|
|
|
| Circuit | |
|
|
|
| Power | Apparent |
| Rush | Leak | breaker |
| Voltage |
| Frequency | consumption | power | Power | current | current | capacity |
Name | [V] | Phase | [Hz] | [kW] | [kVA] | factor | [mA] | [A] | |
|
|
|
|
|
|
|
|
|
|
Power Cabinet | 200 to | Single | 50/60 | 42.6 5 | 44.8 5 | 0.9 or | 100 or | 4.1 or | 30 7 |
SPARC | 240 |
| +2%, |
|
| higher | less 6 | less 6 |
|
Enterprise | VAC |
|
|
|
|
|
|
|
|
M9000 Server | ±10% |
|
|
|
|
|
|
|
|
(base cabinet + |
|
|
|
|
|
|
|
|
|
expansion |
|
|
|
|
|
|
|
|
|
cabinet) 1 |
|
|
|
|
|
|
|
|
|
Rack- | 200 to |
|
| 10.5 2 | 11.0 2 | 0.9 or | 100 or | 4.1 or | 30 7 |
mountable | 240 |
|
|
|
| higher | less 6 | less 6 |
|
Dual Power | VAC |
|
|
|
|
|
|
|
|
Feed | ±10% |
|
|
|
|
|
|
|
|
(for SPARC |
|
|
|
|
|
|
|
|
|
Enterprise
M8000 Server)
1This value represents when power feed is through the Power Cabinet alone.
2This value is reached when four CMUs and four IOUs are installed.
3The 100V power supply is used only for the FST, and this specification applies only to use in Japan.
4This value is reached when eight CMUs and eight IOUs are installed
5This value is reached when 16 CMUs and 16 IOUs are installed.
6This value represents the current for each cable.
7This value represents the capacity of a system main line switch for each power supply of the